1. If checking the oil level using a dipstick, why must gloves be worn?

Gloves must be worn when checking the oil level using a dipstick on a concrete pump truck mounted boom to protect your hands from potential contact with hot engine components or sharp edges. It is a safety precaution to prevent injuries while performing maintenance tasks.

2. Using the Operator's Manual, state the tyres' operating pressure. Note: The Operator's Manual for the machine being used for the test MUST be available for reference by the candidate.

The operating pressure for the tyres can be found in the Operator's Manual for the specific truck-mounted boom concrete pump being used. Please refer to the manual to obtain this information.

3. What is the purpose of pumping grout through the pipeline?

The purpose of pumping grout through the pipeline is to fill voids or cavities in structures, such as cracks or gaps. It is commonly used in construction and repair projects to improve structural integrity, provide support, or seal leaks. Grout is a fluid mixture of cement, sand, and water that can flow easily through the pipeline, allowing it to reach inaccessible areas and ensure proper filling. It is typically pumped under pressure to effectively fill and seal the desired spaces.

4. What checks should be made to the couplers?

When inspecting the couplers on a truck mounted boom concrete pump, you should check for any visible damage, such as cracks, deformations, or excessive wear. Ensure that the sealing surfaces are clean and free from any debris or obstructions. Test the couplers by connecting and disconnecting them, verifying that they engage and disengage smoothly. Pay attention to any abnormal resistance or difficulty in the coupling process. Also, inspect the locking mechanism to confirm that it is functioning correctly. If any issues or concerns are identified, consult the manufacturer's guidelines or seek expert advice for further assessment or maintenance.

5. Describe at least TWO causes of blockages that may occur within the pipeline.

There are several causes of blockages in a concrete pump's pipeline. Two common causes include blockages caused by hardened or dry concrete and blockages caused by foreign objects entering the pipeline. Hardened or dry concrete can form within the pipeline if there is a delay in pumping or if the concrete mix has incorrect proportions of water and aggregates. Foreign objects like stones, chunks of hardened concrete or debris can also enter the pipeline during the pumping process, causing blockages. Regular maintenance and proper inspection of the pipeline can help prevent these blockages.

6. Which parts of the boom concrete pump is the operating radius measured from?

Register to view the answer to this question

The operating radius of a truck-mounted boom concrete pump is typically measured from the center of rotation of the boom. This refers to the point where the boom is attached to the truck chassis and can rotate horizontally. The operating radius is essentially the maximum horizontal distance that the boom can reach, measured from this central point. It's important to consider this measurement when planning the placement of the pump on a construction site to ensure the boom can reach the desired locations.

7. What is the purpose of a risk assessment?

Register to view the answer to this question

The purpose of a risk assessment is to identify and evaluate potential hazards and risks associated with a task or activity. It helps in understanding the likelihood and severity of these risks, so that appropriate control measures can be implemented to prevent accidents or incidents. A risk assessment is crucial in ensuring the safety of workers, as it allows for the identification and prioritization of measures to eliminate or reduce risks. It is also a legal requirement in the construction industry. Overall, a risk assessment helps in creating a safe and healthy working environment.

8. On what basis are pipelines and couplers selected?

Register to view the answer to this question

Pipelines and couplers for truck-mounted boom concrete pumps are selected based on factors like pipe diameter, material strength, and compatibility with the pump. The diameter depends on the required flow rate and distance the concrete needs to be pumped. Material strength is important to withstand the pressure and ensure durability. Compatibility with the pump ensures proper connection and efficient operation. Other considerations may include the type of concrete being pumped, project requirements, and cost-effectiveness. Overall, the selection is based on the specific needs and technical specifications of the project at hand.

9. What are the possible outcomes of facing prosecution for not complying with legislation and regulations?

Register to view the answer to this question

Facing prosecution for not complying with legislation and regulations related to operating a concrete pump truck mounted boom can have several possible outcomes. These may include fines, penalties, or even imprisonment, depending on the seriousness of the offense. Additionally, being convicted of non-compliance can damage your professional reputation and potentially lead to the revocation of licenses or permits required to operate in the construction industry. It is crucial to prioritize compliance with regulations and ensure that you are fully aware of the legal requirements to avoid these potential consequences.

10. What is the maximum allowable air pressure to clean out the pipes?

Register to view the answer to this question

The maximum allowable air pressure to clean out the pipes of a truck-mounted concrete pump boom is typically around 7 to 8 bar. However, please refer to the manufacturer's specifications and guidelines for the specific pump you are using, as the recommended pressure may vary. Ensure that you follow all safety precautions and procedures when operating the pump and cleaning out the pipes.

11. Using the Operator's Manual, state TWO maintenance items to be carried out on the boom. Note: The Operator's Manual for the machine being used for the test MUST be available for reference by the candidate.

Register to view the answer to this question

Two maintenance items to be carried out on the boom are greasing and inspecting for wear and tear. Greasing is essential to ensure the smooth operation of the boom by lubricating moving parts and preventing friction. Regular inspection for wear and tear is necessary to identify any potential issues or damage that may affect the boom's performance or safety. The Operator's Manual should provide detailed guidelines on how often to grease the boom and how to perform a thorough inspection. Always follow the manufacturer's recommendations for maintenance procedures.

12. a)  What is the minimum distance allowed near open trenches when travelling the boom concrete pump on site and b)  explain why?

Register to view the answer to this question

a) The minimum distance allowed near open trenches when travelling the boom concrete pump on site is typically 2 meters.

b) This distance is specified to ensure the stability and safety of the boom concrete pump. Being too close to an open trench increases the risk of the pump toppling over or the boom collapsing into the trench, posing a serious hazard to workers nearby. By maintaining a minimum distance of 2 meters, there is a sufficient safety buffer to mitigate these risks and prevent accidents.

13. Give TWO examples of where The Work at Height Regulations may apply to boom concrete pump operations.

Register to view the answer to this question

The Work at Height Regulations may apply to boom concrete pump operations when working at height, such as operating the boom from an elevated platform or carrying out maintenance or repair work on the boom at an elevated position. Additionally, the regulations may also apply when working near unprotected edges or performing tasks that involve the risk of falling from height, such as assembling or disassembling the boom or securing it to a truck-mounted platform.

14. a)  Who can authorise partial stabiliser extensions and b)  what is the effect on lifting capacity if partially extending the outriggers?

Register to view the answer to this question

a) The person responsible for authorizing partial stabilizer extensions would typically be the site supervisor or the appointed person in charge of the concrete pump operation. They need to assess the site conditions and determine if partial extension is safe and suitable.

b) Partially extending the outriggers of a truck-mounted boom concrete pump can reduce the lifting capacity compared to fully extended outriggers. The exact effect on lifting capacity depends on various factors like the weight distribution, angle, and reach of the boom. It is crucial to consult the manufacturer's specifications and follow their guidelines to ensure safe operation.

15. The operator has to use a new type of vehicle that they are unfamiliar with. What do Regulations (i.e. PUWER 98) and other guidance require the operator to have?

Register to view the answer to this question

Regulations, such as PUWER 98 (Provision and Use of Work Equipment Regulations 1998), require the operator of a truck-mounted concrete pump with a boom to be competent and adequately trained. The operator should receive specific training that covers the safe operation and control of the concrete pump, including understanding the vehicle's features and controls. They should also be aware of any hazards and risks associated with the equipment and follow the manufacturer's instructions and guidelines. Other guidance may include Health and Safety Executive (HSE) publications and industry-specific codes of practice. Overall, the operator must have the necessary competence and knowledge to operate the vehicle safely.

16. What is the purpose of using axle locks?

Register to view the answer to this question

Axle locks are used in truck-mounted boom concrete pumps to provide stability and prevent the truck from rolling or shifting during operation. When the boom is extended and in use, it can create a significant load on the truck's chassis. Axle locks engage the rear wheels of the truck, preventing them from rotating and ensuring that the weight of the boom and the concrete being pumped is evenly distributed. This enhances safety and helps to maintain the stability of the entire system while concrete is being pumped.

17. Name THREE ways that a pump operator can contribute in ensuring repeat business with the client or principal contractor.

Register to view the answer to this question

A pump operator can contribute to ensuring repeat business by:

1. Maintaining open communication with the client and principal contractor, addressing any concerns promptly and professionally.
2. Adhering to project timelines and delivering a high-quality service, meeting or exceeding client expectations.
3. Demonstrating expertise and problem-solving skills, actively suggesting improvements or alternative solutions when necessary. By providing efficient and reliable service, the pump operator can build trust and foster long-term relationships with clients and principal contractors, increasing the likelihood of repeat business.

18. If the boom concrete pump vehicle is being travelled on the public highway, the Road Traffic Act applies. a)  What type of licence and which classes should the operator hold and b)  what is the minimum age allowed?

Register to view the answer to this question

a) The operator of a truck-mounted boom concrete pump vehicle on the public highway should hold a category C or C+E licence, depending on the weight of the vehicle and the trailer. They should also have the appropriate driver qualification card (CP
c) and operator's licence.
b) The minimum age for operating a truck-mounted boom concrete pump vehicle on the public highway is 21 years old, provided the operator has the necessary licence and qualifications.

19. a)  What is considered as the danger zone around the placement hose and b)  what is regarded as the safe minimum?

Register to view the answer to this question

a) The danger zone around the placement hose of a truck mounted boom concrete pump is typically considered to be within a radius of 3 meters (10 feet) from the hose. This area poses a risk of being struck by the moving boom or getting caught in the rotating parts of the equipment.

b) The safe minimum distance around the placement hose is generally regarded as being at least 1 meter (3 feet) away from it. This helps to ensure personal safety and prevents accidental contact with the equipment during operation.

20. What is the function, if fitted, of the mixer paddles?

Register to view the answer to this question

The mixer paddles, if fitted on a truck-mounted boom concrete pump, are responsible for blending the concrete mixture as it is transported from the mixing plant to the desired location. By rotating and mixing the concrete, the paddles ensure that it remains homogeneous and does not separate or settle during transportation. This helps maintain the quality and consistency of the concrete before it is pumped onto the construction site.

21. What checks should be made to the transmitter of a remote-controlled pump before work?

Register to view the answer to this question

Before work, ensure that the batteries in the transmitter are fully charged and the signal strength is sufficient for the required distance. Check that all buttons on the transmitter are functioning correctly, including emergency stop buttons. Inspect the wiring and connections for any signs of damage or wear. Verify that the transmitter is securely attached to the operator's belt or harness. Test the range and function of the remote control within a safe area to ensure proper operation. Finally, always follow the manufacturer's guidelines and refer to the equipment's operation manual for specific checks and maintenance procedures.

22. A boom concrete pump is working in the same vicinity that encroaches the operating radius of a crane. What actions would need to be taken?

Register to view the answer to this question

In such a scenario where a boom concrete pump and a crane are working in close proximity, certain actions need to be taken to ensure safety. Firstly, communication between both teams is vital to coordinate operations. They should establish a clear plan regarding the operating radius of the crane and the boom concrete pump. Safety barriers or physical indicators can be used to clearly demarcate the boundaries. Regular monitoring and coordination throughout the work process is critical. It is also essential to adhere to industry regulations and guidelines to maintain safety standards.

23. Name THREE ways in which an operator can minimise their impact upon the environment whilst using the machine.

Register to view the answer to this question

1. Optimize fuel consumption by adhering to efficient operating practices, such as reducing idle time and considering the most direct route to the work site. Regular maintenance and tuning of the engine can also maximize fuel efficiency.

2. Minimize noise pollution by adhering to local regulations and using noise-reducing technologies, such as sound-dampening equipment and mufflers.

3. Properly dispose of waste materials, including concrete and cleaning agents, to prevent contamination of the environment. Implementing recycling and wastewater treatment programs can further reduce environmental impact.

24. During pumping, if the operator (using a remote control) needs to leave the pump, what needs to be ensured?

Register to view the answer to this question

When the operator leaves the pump during pumping using a remote control, it is crucial to ensure that the pump is securely stabilized, with brakes engaged, to prevent any movement or potential accidents. The remote control should be properly stored and secured to avoid unauthorized use. It is also important to adhere to any specific safety protocols set by the manufacturer or construction site regulations. Regular communication and coordination with other personnel on the site is essential to maintain safety and avoid any mishaps.

25. What THREE main duties of The Health and Safety at Work Act must employees follow?

Register to view the answer to this question

The main duties employees must follow under the Health and Safety at Work Act are:
1. Taking reasonable care of their own safety and the safety of others affected by their work activities.
2. Cooperating with their employer to ensure health and safety measures are in place and followed.
3. Not interfering with or misusing any safety equipment or measures provided by their employer.

26. a)  What is the purpose of a Method Statement and b)  what is required of the operator?

Register to view the answer to this question

a) A method statement is a document that outlines the processes and procedures to safely carry out a specific task or activity in construction. It ensures that work is done in a systematic and controlled manner, reducing the risk of accidents or harm to workers or the public. It includes details like the sequence of work, equipment used, potential hazards, and safety measures.

b) The operator of a truck-mounted boom concrete pump must be competent and trained to operate the equipment safely. They need to follow the manufacturer's instructions, conduct pre-start checks, and ensure that the pump is properly set up and stable. They should also maintain clear communication with other workers, adhere to safe working distances, and monitor the pump's performance during operation. Regular equipment maintenance and inspection are crucial to the operator's responsibilities as well.

27. If required, in what situation does a hard hat NOT need to be worn when operating a boom concrete pump?

Register to view the answer to this question

A hard hat is necessary when operating a boom concrete pump at all times. It provides protection from falling objects and potential head injuries. It is essential for safety on construction sites.

28. If setting up to work near a bank, what is the recommended minimum distance between the stabilisers and the top of the bank?

Register to view the answer to this question

The recommended minimum distance between the stabilisers of a truck-mounted boom concrete pump and the top of a bank when working near it would depend on various factors, such as the stability of the ground, the angle of inclination of the bank, and the specific circumstances. It is essential to refer to the manufacturer's guidelines and consult a structural engineer or a competent person to ensure adherence to relevant safety regulations. Seeking advice from professionals in this matter is crucial to ensure the safety of the work environment.

29. Before cleaning a pipeline with compressed air, what must be removed from the line itself?

Register to view the answer to this question

Before cleaning a pipeline with compressed air, any loose debris, such as dirt or excess concrete, should be removed from the line itself. It is important to ensure that the pipeline is clear of any obstructions that may disrupt the cleaning process or cause damage to the pipeline or the equipment used. Once the line is clear of debris, compressed air can be used to clean the pipeline effectively.

30. Why must the thickness of steel pipelines be checked on a regular basis?

Register to view the answer to this question

The thickness of steel pipelines in a truck-mounted boom concrete pump should be checked regularly to ensure their structural integrity. Regular inspection helps to identify any signs of wear or corrosion that may compromise the strength of the pipeline. A reduction in thickness can weaken the pipeline and potentially lead to a failure, causing accidents or construction delays. Therefore, regular checks are necessary to maintain the safety and efficiency of the concrete pump operations.

31. What does The Health and Safety at Work Act require employers to do with regards specifically to plant?

Register to view the answer to this question

The Health and Safety at Work Act requires employers to ensure the health and safety of their employees when working with plant machinery. This includes providing safe systems of work, adequate training, and suitable supervision. Employers must also properly maintain and inspect plant machinery to prevent any potential hazards. Additionally, they should ensure that employees are provided with appropriate personal protective equipment (PPE) when operating or working near plant machinery. Regular risk assessments should be carried out to identify and address any potential risks associated with the use of plant machinery.

32. During the pumping operation, part of the task cannot be carried out as detailed in the method statement. a)  What initially must happen to the operation and b)  who authorises any changes?

Register to view the answer to this question

a) If part of the pumping operation cannot be carried out as detailed in the method statement, the operation must be paused initially to reassess the situation.

b) Any changes to the operation must be authorised by a competent person designated by the employer, who has the necessary knowledge and authority to make such decisions.

In summary, the operation must be paused and changes must be authorised by a competent person.

33. How can a qualification or card benefit a boom concrete pump operator?

Register to view the answer to this question

A qualification or card can benefit a boom concrete pump operator by providing evidence of their competency and knowledge in operating the equipment safely and effectively. It demonstrates that they have received formal training and have met certain industry standards. This can enhance their credibility, employability, and career prospects, as many construction companies require proof of qualifications or cards to ensure the competence of their workers. It also promotes safety by ensuring that operators have been trained to identify and mitigate potential hazards associated with boom concrete pumping operations.

34. a)  Which part of the boom concrete pump applies loading or pressure to the ground and b)  how can that pressure be reduced?

Register to view the answer to this question

a) The outriggers of the truck-mounted boom concrete pump apply loading or pressure to the ground.

b) The pressure can be reduced by using spreader plates under the outriggers, which help to distribute the load more evenly. Additionally, ensuring that the ground is properly prepared, stable, and capable of supporting the weight of the pump can help reduce the pressure.

35. If setting up to pump concrete in a pedestrianised area, state THREE factors that need to be taken into account.

Register to view the answer to this question

When setting up a concrete pump in a pedestrianised area, three factors to consider are:
1. Safety: Ensure sufficient barriers and signage are in place to protect pedestrians.
2. Noise and disruption: Minimize disturbance to residents and businesses nearby by scheduling the pumping during non-peak hours and using a quieter pump if available.
3. Access and space: Ensure sufficient clearance for the truck-mounted boom and consider any restrictions, such as narrow roads or overhead obstacles, that may affect the operation.

36. What is the meaning of this hand signal (being demonstrated by the Tester)?

Register to view the answer to this question

The hand signal being demonstrated indicates the desired position for the truck-mounted boom of the concrete pump. It is used as a visual communication tool by the tester to direct the operator where to place the boom. This helps ensure that the concrete is delivered precisely to the intended location.

37. Name FOUR different types or levels of disciplinary actions or sanctions that can be applied (by employers and judicial bodies) to operators of plant who do not comply with, or follow legislation and regulations.

Register to view the answer to this question

The four types of disciplinary actions or sanctions that can be applied to operators of plant who don't comply with legislation and regulations are:
1. Verbal warning: Employers can give verbal warnings to operators who fail to comply with regulations as an initial disciplinary action.
2. Written warning: If the operator continues non-compliance, employers can issue a written warning, documenting the offense and potential consequences.
3. Suspension: In more serious cases, employers can temporarily suspend the operator from work as a disciplinary measure.
4. Termination: If non-compliance persists or poses a significant risk, employers may terminate the operator's employment. Judicial bodies may also take legal action if necessary.

38. Where must waste from the cleaning process be deposited?

Register to view the answer to this question

Waste from the cleaning process of a truck-mounted boom concrete pump should be deposited in approved waste disposal containers or facilities. Ensure compliance with local regulations regarding waste disposal.

39. Name THREE possible underground hazards which may affect the stability of the vehicle when in operation.

Register to view the answer to this question

1. Unstable ground conditions such as soft soil, loose fill, or waterlogged areas can affect the stability of the vehicle.
2. Underground utilities such as pipes, cables, or sewer lines can be damaged if not properly identified and avoided, compromising the stability of the vehicle.
3. Poorly planned excavations or trenches in the vicinity can undermine the stability of the vehicle if they are not properly supported or filled in.

40. Prior to travelling the vehicle on the public highway, describe THREE items that should be taken into account when planning a route.

Register to view the answer to this question

When planning a route for a truck-mounted boom concrete pump, there are three important considerations:

1. Bridge clearances: Ensure that the truck can safely pass under any bridges along the route without causing damage or obstruction.

2. Weight restrictions: Take into account any weight restrictions on the roads to avoid overloading the truck, which could lead to structural damage or legal issues.

3. Road conditions: Consider the condition of the roads, including any narrow or winding sections that may pose challenges for maneuvering the truck safely.

41. What FIVE types of information would a client need from pump hirer/owner before a hire?

Register to view the answer to this question

1. Clients would need to know the maximum vertical and horizontal reach of the truck-mounted boom to ensure it can access the desired location.
2. They would need to confirm the pumping capacity of the concrete pump, which determines how much concrete it can deliver per hour.
3. Clients should inquire about the pump's pressure rating, indicating the force at which concrete can be pumped, to ensure it meets the project's requirements.
4. It is essential to know the boom's rotation capabilities, including the continuous slewing angle, as it determines the flexibility in placing the concrete.
5. Finally, clients would need to ask about the availability of any additional equipment or accessories that may be required for the specific job, such as pipeline lengths or boom extensions.

42. Where should the Operator's Manual be kept and why?

Register to view the answer to this question

The Operator's Manual for a truck-mounted boom concrete pump should be kept in the cab of the truck, easily accessible to the operator. This is because the manual provides vital information and instructions that the operator may need to reference while conducting operations. Keeping the manual in the cab ensures that it is readily available in case of any troubleshooting, maintenance, or emergency situations that may arise during the pumping process. It promotes safety and adherence to manufacturer's guidelines, thereby reducing the risk of accidents and equipment damage.

43. List SIX typical subject areas that should be covered in a site induction.

Register to view the answer to this question

1. Health and Safety: Covering essential safety procedures and PPE requirements to ensure the well-being of all workers on site.
2. Site Rules and Regulations: Communicating any specific site rules, such as speed limits, smoking areas, or restricted access zones.
3. Emergency Procedures: Informing workers about the actions to take in case of emergencies, including evacuation routes, assembly points, and key contact information.
4. Work Area and Equipment: Familiarizing workers with the layout of the site, designated work areas, and the safe operation and use of equipment and machinery.
5. Environmental Considerations: Highlighting any environmental sensitivities or requirements, such as waste disposal procedures or protecting nearby wildlife.
6. Specific Job Requirements: Discussing site-specific aspects of the project, such as project goals, timelines, and any unique hazards or challenges.

44. When setting up to work, what should be taken into account for the mixer vehicles?

Register to view the answer to this question

When setting up a truck-mounted concrete pump, several factors need to be considered for the mixer vehicles. First, ensure that the mixer truck has sufficient space to maneuver and position itself properly for the concrete pump. It should have stable ground, away from obstacles or overhead obstructions. The truck should also be positioned at a suitable angle for safe concrete pouring. Additionally, check that the mixer truck is in good working condition, with no leaks or mechanical issues. Regular maintenance and inspection of the mixer vehicle are crucial for efficient and safe operation.

45. What can occur if the placement hose is longer than specified?

Register to view the answer to this question

If the placement hose is longer than specified, several issues could arise. Firstly, it may increase the risk of hose blockages or clogs, leading to disruptions in concrete flow. Secondly, longer hoses can cause additional pressure drop, affecting the pump's performance and efficiency. Furthermore, excessive hose length can result in increased friction losses and reduced velocity, affecting the quality and consistency of the concrete being pumped. It is crucial to adhere to the specified hose length to ensure optimal pumping conditions and maintain the overall performance of the concrete pump.

46. When is it acceptable to use compressed air to clean out pipelines?

Register to view the answer to this question

It is acceptable to use compressed air to clean out pipelines in the construction industry when the pipelines are not damaged or compromised in any way, and when the air pressure used is within safe limits. Regular cleaning of the pipelines can help remove debris and blockages, ensuring smooth flow and preventing any potential issues during concrete pumping operations. However, it is important to follow health and safety guidelines and use appropriate protective equipment when working with compressed air.

47. If radios are to be used during a pumping operation, what FIVE actions and checks must be made by the boom concrete pump operator before use?

Register to view the answer to this question

1. Check that radios are in proper working condition.
2. Ensure that radios are fully charged or have sufficient battery life.
3. Verify that the correct channel and frequency are set on the radios.
4. Test communication between the operator and other personnel using the radios.
5. Confirm that all personnel involved in the pumping operation know how to use the radios effectively.

Remember to follow manufacturer's guidelines and site-specific regulations for radio usage during pumping operations.

48. What is the purpose of the blanking piece?

Register to view the answer to this question

The purpose of the blanking piece is to seal off any openings on the truck mounted boom when the concrete pump is not in operation. This helps to prevent any debris, dirt, or foreign objects from entering the boom and potentially causing damage or blockages. It also helps to maintain the integrity and cleanliness of the system, ensuring that it remains in good working condition when it needs to be used again.

49. Name TWO ways in which wind speed can affect the pumping operation.

Register to view the answer to this question

Wind speed can affect the pumping operation in two ways. Firstly, high wind speeds can cause instability and movement of the truck-mounted boom, which can compromise the safety and accuracy of the pumping process. Secondly, strong winds can cause the concrete being pumped to disperse or segregate, leading to an inconsistent and less durable concrete structure. It is important to monitor and assess wind conditions before commencing pumping to ensure proper adherence to safety protocols and mitigate any potential issues with the concrete quality.

50. a)  What determines the minimum distances that any part of plant and machinery has to be kept from over head electricity lines and b)  explain why a distance should be kept.

Register to view the answer to this question

a) The minimum distances that any part of plant and machinery, including a truck-mounted boom concrete pump, must be kept from overhead electricity lines are determined by health and safety regulations and guidelines established by regulatory authorities.

b) A distance should be kept to minimize the risk of electrocution and potential damage to the machinery and overhead electricity lines. Maintaining this distance helps to prevent accidents, ensures the safety of workers, and reduces the chances of electrical hazards, such as contact with live wires or arcing from nearby power sources. Safety regulations aim to mitigate these risks and promote a safe working environment.

51. During work, the engine starts to overheat. Explain the danger if someone tries to remove the radiator or expansion tank cap.

Register to view the answer to this question

Removing the radiator or expansion tank cap on an overheating concrete pump truck could be very dangerous. It can cause a sudden release of scalding hot coolant or steam, leading to severe burns. Additionally, the coolant system is pressurized, so removing the cap can result in a violent burst of hot liquid or steam, potentially causing injuries or damaging nearby equipment. It is important to let the engine cool down before attempting any maintenance, and always follow proper safety precautions to prevent accidents.

52. Before re-joining the public highway after completing work, what check must be made to the stabilisers?

Register to view the answer to this question

Before re-joining the public highway after completing work, you must check the stabilisers on the truck-mounted boom concrete pump. This is to ensure that they are properly secured and in a stable position. This is important for safety reasons to prevent any movement or instability of the pump while on the road.

53. Name THREE places where the machine should NOT be parked after completion of the pumping operation.

Register to view the answer to this question

After completing the pumping operation, the concrete pump truck with a boom should not be parked in the following places:
1. Soft or unstable ground, as it may sink or tip over
2. Areas with overhead power lines or other low-hanging obstacles, as they can pose a hazard
3. In the way of pedestrian or vehicular traffic, as it can block and impede movement
It is important to park the machine in safe and suitable locations to prevent accidents and ensure efficient operation.

54. What are the main component parts of a concrete mix?

Register to view the answer to this question

The main components of a concrete mix are cement, water, fine aggregate (such as sand), and coarse aggregate (such as gravel or crushed stone). Cement acts as a binding agent, water is used to activate the cement and allow it to harden, and aggregates provide bulk and strength to the mixture. Other additives may be used for specific purposes, such as fly ash or slag to improve durability, or chemical admixtures for enhancing workability or reducing water content. Mixing these components creates a viscous fluid that can be poured and shaped before it sets into a solid structure.

55. If the words STOP NOW are given to the boom concrete pump operator by radio during the lift, what action must the operator take?

Register to view the answer to this question

If the operator receives the words "STOP NOW" via radio during the lift, they must immediately cease all movement and operations of the boom concrete pump to ensure the safety of the site and personnel.

56. What is the definition of, or how can a hazard be described?

Register to view the answer to this question

A hazard can be described as anything that has the potential to cause harm or injury. In the context of a truck-mounted boom concrete pump, hazards may include: overhead power lines, unstable ground conditions, improper operation or maintenance of the equipment, lack of proper training or supervision, and potential for falls or other accidents while working at height. It is important to identify and address these hazards to ensure the safety of workers and the public. Regular risk assessments, proper training, and safety measures are key to mitigating these hazards.

57. Why are pump operators generally regarded as 'safety-critical' workers?

Register to view the answer to this question

Pump operators are considered 'safety-critical' because their role involves operating heavy machinery that can pose significant risks if not handled properly. They are responsible for ensuring the correct setup, positioning, and operation of the truck-mounted boom concrete pump to safely deliver concrete to the desired location. Any errors or negligence in this process can lead to serious accidents, injuries, or damage. Therefore, pump operators must possess extensive knowledge, skill, and experience in operating the equipment, understanding safety protocols, and managing potential hazards to mitigate risks effectively.

58. a)  What is meant by a knuckle-boom and b)  what is an advantage of this type of arrangement?

Register to view the answer to this question

a) A knuckle-boom on a concrete pump refers to a type of boom that is hinged, allowing it to bend or fold in multiple places. This flexible design enables greater reach and maneuverability compared to a rigid boom.

b) One advantage of a knuckle-boom arrangement is its ability to access confined or restricted areas where a rigid boom may not fit. The ability to fold and bend the boom makes it easier to navigate around obstacles and position the concrete pump in challenging spaces. This flexibility can increase productivity and efficiency on construction sites with limited access.

59. If using a boom concrete pump from a fixed position operating station, what should be ensured for the safety of the operator?

Register to view the answer to this question

When using a boom concrete pump from a fixed position operating station, several safety measures should be ensured for the operator's safety:

1. Adequate training: The operator should be properly trained to operate the boom concrete pump, understanding its controls and safety features.
2. Personal protective equipment (PPE): The operator should wear PPE, including a hard hat, safety boots, and high-visibility clothing.
3. Clear communication: Effective communication with other workers is vital to ensure the safe operation of the pump.
4. Proper maintenance: Regular inspection and maintenance of the equipment should be carried out to identify and address any potential safety issues.
5. Keep a safe distance: Operators should maintain a safe distance from the moving parts of the boom to avoid accidents.

Remember, safety should always be a priority.

60. Before the start for work: a)  How should signallers be identified and b)  what should be agreed between the pump operator and a signaller?

Register to view the answer to this question

a) Signallers on a concrete pump truck should be identified by wearing high-visibility clothing and designated with identifying armbands or badges.

b) Between the pump operator and the signaller, they should agree on clear communication methods and signals to be used during operation. They should also establish a plan for maintaining a safe distance between the pump and any potential hazards. Additionally, they should agree on emergency procedures and understand each other's roles and responsibilities.

61. Before leaving the vehicle for a rest break, after parking and switching off the vehicle, what final action must be carried out?

Register to view the answer to this question

Engage the parking brake, lower the boom to a safe position, and ensure all hydraulic controls are in their neutral position.

62. On a piston-type pump, what is the purpose of the water box?

Register to view the answer to this question

The water box on a piston-type concrete pump serves to cool the hydraulic oil by circulating water around the oil cooler. Cooling the hydraulic oil helps to prevent overheating of the pump's components during operation, thereby ensuring optimal performance and extending the lifespan of the pump.

63. Give THREE possible reasons why concrete pump vehicles should not stray off the designated access routes.

Register to view the answer to this question

Straying off designated access routes in concrete pump vehicles may cause damage to underground utilities, such as pipes and cables, leading to costly repairs. It can also pose a safety risk to pedestrians and other vehicles due to the large size and weight of the vehicle. Additionally, going off-route may result in damage to the surrounding environment or landscaping, which would require restoration. Therefore, adhering to designated access routes is crucial for avoiding potential accidents, minimizing expenses, and protecting the integrity of the infrastructure and environment.

64. Give THREE reasons that may cause the boom concrete pump to overturn.

Register to view the answer to this question

Three reasons that may cause a boom concrete pump to overturn are: unstable ground conditions, improper set-up and operation, and exceeding the boom's maximum load capacity. Unstable ground conditions, such as soft or uneven surfaces, can lead to the pump toppling over. Improper set-up and operation, such as using incorrect outrigger extension or neglecting to properly secure the pump, can also lead to overturning. Lastly, exceeding the boom's maximum load capacity can cause imbalance and put excessive stress on the pump, potentially leading to overturning. It is crucial to assess and address these risks to ensure safety during operation.

65. What are the THREE actions or stages that a boom concrete pump operator undertakes during pre-use inspections?

Register to view the answer to this question

The three actions or stages that a boom concrete pump operator undertakes during pre-use inspections are:
1. Visual inspection of the equipment for any signs of damage or wear.
2. Functional testing of the boom, including checking the movement, control systems, and safety devices.
3. Verification of the safety equipment and accessories, such as outriggers, stabilizers, and emergency stop buttons. These actions are essential for ensuring the safe operation of the concrete pump and preventing any potential accidents or failures during use.

66. What is the purpose of stabilisers on the boom concrete pump?

Register to view the answer to this question

The stabilisers on a boom concrete pump are designed to enhance stability and prevent tipping. They are deployed to counterbalance the weight and forces exerted by the extending boom. Stabilisers provide a larger footprint and distribute the weight over a wider area, ensuring that the pump remains steady during operation. They play a critical role in maintaining safety and preventing accidents on construction sites.

67. On many construction sites, when MUST a banksman or signaller be used before moving a boom concrete pump?

Register to view the answer to this question

A banksman or signaller must be used before moving a boom concrete pump on construction sites when there is a risk of collision or danger to personnel or equipment. This is particularly necessary when the boom is obstructed or there are blind spots that hinder visibility. The banksman's role is to guide the operator and ensure safe movement of the pump. Their presence helps prevent accidents and ensures effective communication between the operator and other workers. It is crucial to prioritize safety and follow industry guidelines to mitigate risks.

68. Apart from the operator, who else may need to use the machine's Operator's Manual?

Register to view the answer to this question

In addition to the operator, other individuals who may need to refer to the machine's Operator's Manual include maintenance technicians, service professionals, and safety inspectors. The manual provides detailed instructions and information about the machine's operation, maintenance, safety procedures, and troubleshooting. It serves as a valuable reference for anyone responsible for the maintenance, servicing, or inspection of the concrete pump truck mounted boom.

69. What is the difference between: a)  a placement hose and b)  a delivery hose?

Register to view the answer to this question

A placement hose is used to guide and direct the concrete to its intended location on the construction site. It is typically connected to the end of the boom and is responsible for accurate placement.

A delivery hose, on the other hand, is used to transport the concrete from the pump to the placement hose. It connects the pump to the boom and allows the concrete to flow through.

In summary, the placement hose is for precise positioning of the concrete, while the delivery hose is for conveying the concrete from the pump to the placement hose.